Riverbed Monitoring

Annual high water levels can continuously change the configuration of a river bed. MSI has worked on many projects that include the re-survey of sections of riverbed at pipeline crossings to determine if the river channels have shifted or the depth of cover has changed. MSI has completed these surveys on an annual basis and after high water flow events. MSI then provides surface differential plans to show areas that riverbed material is gathering or washing away. These differential plans allow our clients to predict how high flow or other weather events will affect their pipelines crossings.

 

Pine 3ComparisonV4 NSaskDraytonCOMPARISONV2